← Photo Gallery: Summer Renovation Projects at Holy Cross Wide-Ranging

26_construction11

The heating, ventilation and air conditioning wall units are being replaced in the rooms of Loyola Hall.

Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *